Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2024 |
Principal Product | Canned Fruits And Vegetables |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2033 - Canned Fruits And Vegetables |
Sales | $10,000,000-$50,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 22,000 |
Annual Production | 10,634,724 Units |
Production Hrs. Annual | 3,640 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $37,497 | 392,761 | kWh | $0.10 |
Electricity Demand | $6,423 | 1,558 | kW-months/year | $4.12 |
Natural Gas | $17,212 | 3,983 | MMBtu | $4.32 |
Fuel Oil #2 | $14,148 | 350 | MMBtu | $40.38 |
TOTAL ENERGY COSTS | $75,280 | |||
RECOMMENDED SAVINGS* | $95,694 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | One-time Revenue or Avoided Cost | Increase in Production | Electricity Usage | Natural Gas | Fuel Oil #2 | One-time Revenue or Avoided Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,047 Cost: $135 |
$1,047 | 11,020 | - | - | - | - | - | - | - | - |
$1,047 11,020 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $37,002 Cost: $144,549 |
- | - | - | - | $13,002 | 322 | $24,000 | - | - | - |
- - kWh |
- - MMBtu |
$13,002 322 MMBtu |
$24,000 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1224 REPLACE BOILER |
Savings: $57,645 Cost: $247,500 |
- | - | $5,747 | 1,330 | - | - | - | - | $51,898 | - |
- - kWh |
$5,747 1,330 MMBtu |
- - MMBtu |
- - $ |
$51,898 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $95,694 Cost: $392,184 |
$1,047 | 11,020 | $5,747 | 1,330 | $13,002 | 322 | $24,000 | - | $51,898 | - | $1,047 11,020 kWh |
$5,747 1,330 MMBtu |
$13,002 322 MMBtu |
$24,000 - $ |
$51,898 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | One-time Revenue or Avoided Cost | Increase in Production | Electricity Usage | Natural Gas | Fuel Oil #2 | One-time Revenue or Avoided Cost | Increase in Production |