IAC logo
IAC Assessment: LS2408
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2408
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2024
Principal Product Canned Fruits And Vegetables
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 22,000
Annual Production 10,634,724 Units
Production Hrs. Annual 3,640
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,497 392,761 kWh $0.10
Electricity Demand $6,423 1,558 kW-months/year $4.12
Natural Gas $17,212 3,983 MMBtu $4.32
Fuel Oil #2 $14,148 350 MMBtu $40.38
TOTAL ENERGY COSTS $75,280
RECOMMENDED SAVINGS* $95,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production Electricity Usage Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production
$ kWh $ MMBtu $ MMBtu $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,047
Cost:
$135
$1,047 11,020 - - - - - - - - $1,047
11,020
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
%
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$37,002
Cost:
$144,549
- - - - $13,002 322 $24,000 - - - -
-
kWh
-
-
MMBtu
$13,002
322
MMBtu
$24,000
-
$
-
-
%
03: 2.1224 REPLACE BOILER Savings:
$57,645
Cost:
$247,500
- - $5,747 1,330 - - - - $51,898 - -
-
kWh
$5,747
1,330
MMBtu
-
-
MMBtu
-
-
$
$51,898
-
%
TOTAL RECOMMENDED Savings:
$95,694
Cost:
$392,184
$1,047 11,020 $5,747 1,330 $13,002 322 $24,000 - $51,898 - $1,047
11,020
kWh
$5,747
1,330
MMBtu
$13,002
322
MMBtu
$24,000
-
$
$51,898
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ %
Electricity Usage Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production Electricity Usage Natural Gas Fuel Oil #2 One-time Revenue or Avoided Cost Increase in Production