Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2025 |
Principal Product | Processed Shrimp |
NAICS | 311710 - Seafood Product Preparation and Packaging |
SIC | 2091 - Canned And Cured Fish And Seafoods |
Sales | $1,000,000-$5,000,000 |
# of Employees | 8 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 2,000,000 Pounds |
Production Hrs. Annual | 2,940 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,638 | 397,781 | kWh | $0.18 |
Natural Gas | $21,368 | 2,406 | MMBtu | $8.88 |
LPG | $1,707 | 43 | MMBtu | $39.70 |
TOTAL ENERGY COSTS | $92,713 | |||
RECOMMENDED SAVINGS* | $62,605 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Administrative Changes | Increase in Production | Electricity Usage | Natural Gas | LPG | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $29,625 Cost: $52,000 |
- | - | $2,185 | 246 | - | - | - | - | $27,440 | - |
- - kWh |
$2,185 246 MMBtu |
- - MMBtu |
- - $ |
$27,440 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $3,979 Cost: $12,000 |
- | - | $3,979 | 448 | - | - | - | - | - | - |
- - kWh |
$3,979 448 MMBtu |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $11,791 Cost: $45,000 |
$6,791 | 38,808 | - | - | - | - | $5,000 | - | - | - |
$6,791 38,808 kWh |
- - MMBtu |
- - MMBtu |
$5,000 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $17,210 Cost: $96,366 |
$(-524) | (-2,995) | - | - | $1,734 | 43 | $16,000 | - | - | - |
$(-524) (-2,995) kWh |
- - MMBtu |
$1,734 43 MMBtu |
$16,000 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,605 Cost: $205,366 |
$6,267 | 35,813 | $6,164 | 694 | $1,734 | 43 | $21,000 | - | $27,440 | - | $6,267 35,813 kWh |
$6,164 694 MMBtu |
$1,734 43 MMBtu |
$21,000 - $ |
$27,440 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Administrative Changes | Increase in Production | Electricity Usage | Natural Gas | LPG | Administrative Changes | Increase in Production |