IAC Assessment: LT0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1985
Principal Product CORRUGATED PACKAGING
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 684 Thousand Feet
Production Hrs. Annual 6,780
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $321,442 5,063,013 kWh $0.06
Natural Gas $236,001 54,737 MMBtu $4.31
TOTAL ENERGY COSTS $557,443
RECOMMENDED SAVINGS* $46,329 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,819
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,318
Cost:
$300
- - $8,318 1,930 - - -
-
kWh
$8,318
1,930
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$19,870
Cost:
$11,300
- - $19,870 4,610 - - -
-
kWh
$19,870
4,610
MMBtu
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,340
Cost:
$405
- - $1,340 311 - - -
-
kWh
$1,340
311
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,384
Cost:
$138
- - $1,384 321 - - -
-
kWh
$1,384
321
MMBtu
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,460
Cost:
$15
- - $2,460 571 - - -
-
kWh
$2,460
571
MMBtu
-
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,239
Cost:
$2,800
$1,094 19,930 - - $145 - $1,094
19,930
kWh
-
-
MMBtu
$145
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,208
Cost:
$300
$2,385 37,515 $1,823 423 - - $2,385
37,515
kWh
$1,823
423
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,510
Cost:
$3,337
$7,510 152,989 - - - - $7,510
152,989
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,329
Cost:
$18,595
$10,989 210,434 $35,195 8,166 $145 - $10,989
210,434
kWh
$35,195
8,166
MMBtu
$145
-
$
TOTAL IMPLEMENTED Savings:
$38,819
Cost:
$15,258
$3,479 57,445 $35,195 8,166 $145 - $3,479
57,445
kWh
$35,195
8,166
MMBtu
$145
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes