IAC logo
IAC Assessment: LT0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1985
Principal Product PLYWOOD
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 346
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Thousand Feet
Production Hrs. Annual 6,700
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,820,645 32,092,322 kWh $0.06
Natural Gas $25,403 5,513 MMBtu $4.61
Wood $1,114,350 1,277,788 MMBtu $0.87
TOTAL ENERGY COSTS $2,960,398
RECOMMENDED SAVINGS* $205,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,203
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2514 COVER OPEN TANKS Savings:
$3,245
Cost:
$1,440
- - $3,245 4,150 - - -
-
kWh
$3,245
4,150
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13,200
Cost:
-
$16,930 286,635 - - $(-3,730) - $16,930
286,635
kWh
-
-
MMBtu
$(-3,730)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,708
Cost:
-
$24,990 521,688 - - $(-7,282) - $24,990
521,688
kWh
-
-
MMBtu
$(-7,282)
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,050
Cost:
$417
- - $1,050 1,340 - - -
-
kWh
$1,050
1,340
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$166,000
Cost:
$18,000
- - $166,000 212,000 - - -
-
kWh
$166,000
212,000
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,848
Cost:
-
$3,848 67,409 - - - - $3,848
67,409
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$205,051
Cost:
$19,857
$45,768 875,732 $170,295 217,490 $(-11,012) - $45,768
875,732
kWh
$170,295
217,490
MMBtu
$(-11,012)
-
$
TOTAL IMPLEMENTED Savings:
$35,203
Cost:
$1,857
$41,920 808,323 $4,295 5,490 $(-11,012) - $41,920
808,323
kWh
$4,295
5,490
MMBtu
$(-11,012)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes