Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana Tech |
---|---|
Assessment Year | 1985 |
Principal Product | PLYWOOD |
NAICS | n/a |
SIC | 2436 - Softwood Veneer And Plywood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 346 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 200,000 Thousand Feet |
Production Hrs. Annual | 6,700 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,820,645 | 32,092,322 | kWh | $0.06 |
Natural Gas | $25,403 | 5,513 | MMBtu | $4.61 |
Wood | $1,114,350 | 1,277,788 | MMBtu | $0.87 |
TOTAL ENERGY COSTS | $2,960,398 | |||
RECOMMENDED SAVINGS* | $205,051 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,203 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2514 COVER OPEN TANKS |
Savings: $3,245 Cost: $1,440 |
- | - | $3,245 | 4,150 | - | - |
- - kWh |
$3,245 4,150 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $13,200 Cost: - |
$16,930 | 286,635 | - | - | $(-3,730) | - |
$16,930 286,635 kWh |
- - MMBtu |
$(-3,730) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $17,708 Cost: - |
$24,990 | 521,688 | - | - | $(-7,282) | - |
$24,990 521,688 kWh |
- - MMBtu |
$(-7,282) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,050 Cost: $417 |
- | - | $1,050 | 1,340 | - | - |
- - kWh |
$1,050 1,340 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $166,000 Cost: $18,000 |
- | - | $166,000 | 212,000 | - | - |
- - kWh |
$166,000 212,000 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,848 Cost: - |
$3,848 | 67,409 | - | - | - | - |
$3,848 67,409 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $205,051 Cost: $19,857 |
$45,768 | 875,732 | $170,295 | 217,490 | $(-11,012) | - | $45,768 875,732 kWh |
$170,295 217,490 MMBtu |
$(-11,012) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,203 Cost: $1,857 |
$41,920 | 808,323 | $4,295 | 5,490 | $(-11,012) | - | $41,920 808,323 kWh |
$4,295 5,490 MMBtu |
$(-11,012) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes |