IAC logo
IAC Assessment: LT0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1985
Principal Product RICE
NAICS n/a
SIC 2044 - Rice Milling
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $939,300 19,048,066 kWh $0.05
Natural Gas $391,979 102,466 MMBtu $3.83
TOTAL ENERGY COSTS $1,331,279
RECOMMENDED SAVINGS* $41,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,377
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,407
Cost:
-
- - $2,007 524 $(-600) - -
-
kWh
$2,007
524
MMBtu
$(-600)
-
$
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$19,893
Cost:
$35,000
- - $19,893 5,194 - - -
-
kWh
$19,893
5,194
MMBtu
-
-
$
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$11,720
Cost:
$10,000
- - $11,720 3,060 - - -
-
kWh
$11,720
3,060
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,800
Cost:
$1,416
$6,800 138,628 - - - - $6,800
138,628
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,250
Cost:
$450
$766 17,585 $484 126 - - $766
17,585
kWh
$484
126
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$41,070
Cost:
$46,866
$7,566 156,213 $34,104 8,904 $(-600) - $7,566
156,213
kWh
$34,104
8,904
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$14,377
Cost:
$10,450
$766 17,585 $14,211 3,710 $(-600) - $766
17,585
kWh
$14,211
3,710
MMBtu
$(-600)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes