Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1986
Principal Product PRESTRESSED CONCRETE
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 27,000 Thousand Feet
Production Hrs. Annual 2,210
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,226 138,042 kWh $0.12
Natural Gas $72,564 16,933 MMBtu $4.29
TOTAL ENERGY COSTS $89,790
RECOMMENDED SAVINGS* $23,902 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,107
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,910
Cost:
-
$3,910 47,479 - - - - $3,910
47,479
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$575
Cost:
-
$575 7,034 - - - - $575
7,034
kWh
-
-
MMBtu
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$11,458
Cost:
$28,763
- - $9,438 2,200 $2,020 - -
-
kWh
$9,438
2,200
MMBtu
$2,020
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,214
Cost:
$2,000
- - $2,214 516 - - -
-
kWh
$2,214
516
MMBtu
-
-
$
06: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$1,737
Cost:
$3,000
- - $1,737 405 - - -
-
kWh
$1,737
405
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,600
Cost:
$10,000
- - $3,600 840 - - -
-
kWh
$3,600
840
MMBtu
-
-
$
08: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$408
Cost:
$1,000
- - $408 95 - - -
-
kWh
$408
95
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,902
Cost:
$44,763
$4,485 54,513 $17,397 4,056 $2,020 - $4,485
54,513
kWh
$17,397
4,056
MMBtu
$2,020
-
$
TOTAL IMPLEMENTED Savings:
$7,107
Cost:
$3,000
$4,485 54,513 $2,622 611 - - $4,485
54,513
kWh
$2,622
611
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes