IAC Assessment: LT0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1986
Principal Product PLYWOOD
NAICS n/a
SIC 2436 - Softwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 0
Annual Production 164,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,163,950 24,094,959 kWh $0.05
Natural Gas $680,779 186,691 MMBtu $3.65
Wood $1,199,900 923,004 MMBtu $1.30
TOTAL ENERGY COSTS $3,044,629
RECOMMENDED SAVINGS* $306,103 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,039
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$52,000
Cost:
$6,000
- - $52,000 56,280 - - -
-
kWh
$52,000
56,280
MMBtu
-
-
$
02: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$20,288
Cost:
$9,000
- - $19,230 14,800 $1,058 - -
-
kWh
$19,230
14,800
MMBtu
$1,058
-
$
03: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$33,764
Cost:
$3,000
- - $32,000 24,400 $1,764 - -
-
kWh
$32,000
24,400
MMBtu
$1,764
-
$
04: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$199,300
Cost:
$690,000
$278,000 6,913,247 $(-78,700) (-60,500) - - $278,000
6,913,247
kWh
$(-78,700)
(-60,500)
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$751
Cost:
$155
- - $751 578 - - -
-
kWh
$751
578
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$306,103
Cost:
$708,155
$278,000 6,913,247 $25,281 35,558 $2,822 - $278,000
6,913,247
kWh
$25,281
35,558
MMBtu
$2,822
-
$
TOTAL IMPLEMENTED Savings:
$73,039
Cost:
$15,155
- - $71,981 71,658 $1,058 - -
-
kWh
$71,981
71,658
MMBtu
$1,058
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes