IAC logo
IAC Assessment: MA0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product TIMER MOTORS & TIMERS
NAICS n/a
SIC 3873 - Watches, Clocks, Watchcases & Parts
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 7,500,000 Pieces
Production Hrs. Annual 7,200
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,977 3,235,932 kWh $0.09
Natural Gas $17,332 3,073 MMBtu $5.64
Fuel Oil #6 $31,008 6,126 MMBtu $5.06
TOTAL ENERGY COSTS $338,317
RECOMMENDED SAVINGS* $27,720 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,872
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$735
Cost:
$378
$735 8,206 - - - - $735
8,206
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$2,731
Cost:
$6,200
- - $(-3,999) (-709) $6,730 1,330 -
-
kWh
$(-3,999)
(-709)
MMBtu
$6,730
1,330
MMBtu
03: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$17,848
Cost:
$12,090
- - $9,408 1,668 $8,440 1,668 -
-
kWh
$9,408
1,668
MMBtu
$8,440
1,668
MMBtu
04: 2.8115 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED Savings:
$6,406
Cost:
$2,900
- - - - $6,406 - -
-
kWh
-
-
MMBtu
$6,406
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,720
Cost:
$21,568
$735 8,206 $5,409 959 $21,576 2,998 $735
8,206
kWh
$5,409
959
MMBtu
$21,576
2,998
MMBtu
TOTAL IMPLEMENTED Savings:
$9,872
Cost:
$9,478
$735 8,206 $(-3,999) (-709) $13,136 1,330 $735
8,206
kWh
$(-3,999)
(-709)
MMBtu
$13,136
1,330
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6