Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1985 |
Principal Product | FINE STEEL WIRE |
NAICS | n/a |
SIC | 3315 - Steel Wire And Related Products |
Sales | $5,000,000-$10,000,000 |
# of Employees | 63 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,440,000 Pounds |
Production Hrs. Annual | 4,080 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $102,025 | 1,306,858 | kWh | $0.08 |
Natural Gas | $90,817 | 14,223 | MMBtu | $6.39 |
Fuel Oil #2 | $34,879 | 5,908 | MMBtu | $5.90 |
Fuel Oil #4 | $125,011 | 22,882 | MMBtu | $5.46 |
TOTAL ENERGY COSTS | $352,732 | |||
RECOMMENDED SAVINGS* | $22,582 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,659 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,013 Cost: $1,515 |
$1,013 | 12,896 | - | - | - | - |
$1,013 12,896 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,095 Cost: $1,536 |
- | - | - | - | $1,095 | 202 |
- - kWh |
- - MMBtu |
$1,095 202 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $135 Cost: $214 |
- | - | - | - | $135 | 24 |
- - kWh |
- - MMBtu |
$135 24 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $10,416 Cost: $8,764 |
- | - | $10,416 | 1,653 | - | - |
- - kWh |
$10,416 1,653 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $9,923 Cost: $15,106 |
- | - | - | - | $9,923 | 1,831 |
- - kWh |
- - MMBtu |
$9,923 1,831 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,582 Cost: $27,135 |
$1,013 | 12,896 | $10,416 | 1,653 | $11,153 | 2,057 | $1,013 12,896 kWh |
$10,416 1,653 MMBtu |
$11,153 2,057 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,659 Cost: $12,029 |
$1,013 | 12,896 | $10,416 | 1,653 | $1,230 | 226 | $1,013 12,896 kWh |
$10,416 1,653 MMBtu |
$1,230 226 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #4 |