IAC Assessment: MA0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product GRAY IRON DUCT CASTINGS
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 4,000 Tons
Production Hrs. Annual 2,328
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $690,574 9,672,040 kWh $0.07
Natural Gas $101,969 16,243 MMBtu $6.28
Fuel Oil #4 $103,848 16,819 MMBtu $6.17
TOTAL ENERGY COSTS $896,391
RECOMMENDED SAVINGS* $34,541 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,541
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$11,304
Cost:
-
- - $11,304 1,800 - - - - -
-
kWh
$11,304
1,800
MMBtu
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,175
Cost:
$821
$2,175 30,481 - - - - - - $2,175
30,481
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$1,144
Cost:
$2,804
- - - - $1,144 187 - - -
-
kWh
-
-
MMBtu
$1,144
187
MMBtu
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$16,278
Cost:
$715
- - - - $19,008 3,101 $(-2,730) - -
-
kWh
-
-
MMBtu
$19,008
3,101
MMBtu
$(-2,730)
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,640
Cost:
$2,000
- - - - $3,640 594 - - -
-
kWh
-
-
MMBtu
$3,640
594
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,541
Cost:
$6,340
$2,175 30,481 $11,304 1,800 $23,792 3,882 $(-2,730) - $2,175
30,481
kWh
$11,304
1,800
MMBtu
$23,792
3,882
MMBtu
$(-2,730)
-
$
TOTAL IMPLEMENTED Savings:
$34,541
Cost:
$6,340
$2,175 30,481 $11,304 1,800 $23,792 3,882 $(-2,730) - $2,175
30,481
kWh
$11,304
1,800
MMBtu
$23,792
3,882
MMBtu
$(-2,730)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes