IAC logo
IAC Assessment: MA0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1986
Principal Product NOZZLES
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $5,000,000-$10,000,000
# of Employees 95
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pieces
Production Hrs. Annual 4,080
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,694 757,913 kWh $0.08
LPG $13,720 1,356 MMBtu $10.12
TOTAL ENERGY COSTS $74,414
RECOMMENDED SAVINGS* $5,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $746
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$262
Cost:
-
$262 3,224 - - $262
3,224
kWh
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$125
Cost:
$150
- - $125 12 -
-
kWh
$125
12
MMBtu
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$484
Cost:
$900
- - $484 48 -
-
kWh
$484
48
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,076
Cost:
$7,000
$3,076 38,394 - - $3,076
38,394
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,611
Cost:
$4,710
$(-23) (-293) $1,634 130 $(-23)
(-293)
kWh
$1,634
130
MMBtu
TOTAL RECOMMENDED Savings:
$5,558
Cost:
$12,760
$3,315 41,325 $2,243 190 $3,315
41,325
kWh
$2,243
190
MMBtu
TOTAL IMPLEMENTED Savings:
$746
Cost:
$900
$262 3,224 $484 48 $262
3,224
kWh
$484
48
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG