IAC logo
IAC Assessment: MA0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1986
Principal Product MOLDED RUBBER PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 350,000 Pieces
Production Hrs. Annual 6,120
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $511,446 6,471,864 kWh $0.08
Natural Gas $13,639 1,749 MMBtu $7.80
Fuel Oil #2 $45,866 7,911 MMBtu $5.80
TOTAL ENERGY COSTS $570,951
RECOMMENDED SAVINGS* $188,373 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $178,831
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$4,493
Cost:
$3,458
$4,493 56,858 - - $4,493
56,858
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,827
Cost:
$2,280
$13,827 174,971 - - $13,827
174,971
kWh
-
-
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$126,986
Cost:
$6,650
$126,986 1,606,975 - - $126,986
1,606,975
kWh
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$27,051
Cost:
$2,280
$27,051 342,321 - - $27,051
342,321
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,537
Cost:
$22,460
$8,060 101,993 $(-2,523) (-435) $8,060
101,993
kWh
$(-2,523)
(-435)
MMBtu
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$5,049
Cost:
$490
$5,049 63,892 - - $5,049
63,892
kWh
-
-
MMBtu
07: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$2,326
Cost:
$15,600
- - $2,326 401 -
-
kWh
$2,326
401
MMBtu
08: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,104
Cost:
$6,688
$(-208) (-2,638) $3,312 571 $(-208)
(-2,638)
kWh
$3,312
571
MMBtu
TOTAL RECOMMENDED Savings:
$188,373
Cost:
$59,906
$185,258 2,344,372 $3,115 537 $185,258
2,344,372
kWh
$3,115
537
MMBtu
TOTAL IMPLEMENTED Savings:
$178,831
Cost:
$55,958
$175,716 2,223,622 $3,115 537 $175,716
2,223,622
kWh
$3,115
537
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2