IAC logo
IAC Assessment: MA0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1986
Principal Product RUBBER CMPDS & PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $348,987 3,699,004 kWh $0.09
Natural Gas $15,606 3,252 MMBtu $4.80
Fuel Oil #2 $33,021 5,600 MMBtu $5.90
Fuel Oil #4 $30,745 5,760 MMBtu $5.34
TOTAL ENERGY COSTS $428,359
RECOMMENDED SAVINGS* $73,373 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,373
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #4 Administrative Changes Electricity Usage Fuel Oil #2 Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,220
Cost:
$200
$2,220 23,447 - - - - - - $2,220
23,447
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$13,251
Cost:
$600
- - $6,879 1,180 $6,372 1,180 - - -
-
kWh
$6,879
1,180
MMBtu
$6,372
1,180
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$34,923
Cost:
$1,500
$32,289 342,907 $3,234 555 - - $(-600) - $32,289
342,907
kWh
$3,234
555
MMBtu
-
-
MMBtu
$(-600)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,691
Cost:
$720
$9,691 102,579 - - - - - - $9,691
102,579
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,992
Cost:
$6,740
$13,857 146,835 - - $(-3,865) (-716) - - $13,857
146,835
kWh
-
-
MMBtu
$(-3,865)
(-716)
MMBtu
-
-
$
06: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$3,296
Cost:
$750
- - - - $3,296 611 - - -
-
kWh
-
-
MMBtu
$3,296
611
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$73,373
Cost:
$10,510
$58,057 615,768 $10,113 1,735 $5,803 1,075 $(-600) - $58,057
615,768
kWh
$10,113
1,735
MMBtu
$5,803
1,075
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$73,373
Cost:
$10,510
$58,057 615,768 $10,113 1,735 $5,803 1,075 $(-600) - $58,057
615,768
kWh
$10,113
1,735
MMBtu
$5,803
1,075
MMBtu
$(-600)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Fuel Oil #2 Fuel Oil #4 Administrative Changes Electricity Usage Fuel Oil #2 Fuel Oil #4 Administrative Changes