IAC Assessment: MA0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1988
Principal Product CENTRALIZED LUB. EQUIPMENT
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 124
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,160
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,851 1,303,048 kWh $0.10
Fuel Oil #2 $8,317 1,919 MMBtu $4.33
TOTAL ENERGY COSTS $138,168
RECOMMENDED SAVINGS* $30,993 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,841
Cost:
$320
$3,841 37,808 - - $3,841
37,808
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$435
Cost:
$515
$108 1,172 $327 75 $108
1,172
kWh
$327
75
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,585
Cost:
-
$(-1,001) (-9,965) $7,586 1,752 $(-1,001)
(-9,965)
kWh
$7,586
1,752
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,632
Cost:
$1,450
$12,830 126,612 $(-2,198) (-508) $12,830
126,612
kWh
$(-2,198)
(-508)
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$9,500
Cost:
$7,500
$9,500 93,787 - - $9,500
93,787
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,993
Cost:
$9,785
$25,278 249,414 $5,715 1,319 $25,278
249,414
kWh
$5,715
1,319
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2