Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1988 |
Principal Product | INDUSTRIAL TISSUES |
NAICS | n/a |
SIC | 2621 - Paper Mills |
Sales | $5,000,000-$10,000,000 |
# of Employees | 33 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 3,000 Tons |
Production Hrs. Annual | 5,760 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $305,168 | 4,514,947 | kWh | $0.07 |
Fuel Oil #6 | $227,385 | 64,567 | MMBtu | $3.52 |
TOTAL ENERGY COSTS | $532,553 | |||
RECOMMENDED SAVINGS* | $472,821 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,907 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,171 Cost: $1,275 |
- | - | $4,171 | 1,185 | - | - |
- - kWh |
$4,171 1,185 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $8,138 Cost: $1,464 |
- | - | $9,508 | 2,701 | $(-1,370) | - |
- - kWh |
$9,508 2,701 MMBtu |
$(-1,370) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,626 Cost: $930 |
- | - | $2,626 | 746 | - | - |
- - kWh |
$2,626 746 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $743 Cost: $990 |
- | - | $743 | 211 | - | - |
- - kWh |
$743 211 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $63,601 Cost: $46,000 |
$63,601 | 815,358 | - | - | - | - |
$63,601 815,358 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,658 Cost: $377 |
- | - | $2,658 | 755 | - | - |
- - kWh |
$2,658 755 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,200 Cost: $340 |
- | - | $2,200 | 625 | - | - |
- - kWh |
$2,200 625 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $371,179 Cost: $670,000 |
$292,032 | 3,744,138 | $79,147 | 22,485 | - | - |
$292,032 3,744,138 kWh |
$79,147 22,485 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,742 Cost: $2,160 |
- | - | $2,742 | 779 | - | - |
- - kWh |
$2,742 779 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $14,763 Cost: $20,100 |
- | - | $14,763 | 4,194 | - | - |
- - kWh |
$14,763 4,194 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $472,821 Cost: $743,636 |
$355,633 | 4,559,496 | $118,558 | 33,681 | $(-1,370) | - | $355,633 4,559,496 kWh |
$118,558 33,681 MMBtu |
$(-1,370) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,907 Cost: $5,921 |
- | - | $18,277 | 5,192 | $(-1,370) | - | - - kWh |
$18,277 5,192 MMBtu |
$(-1,370) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes |