IAC Assessment: MA0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1988
Principal Product ALPINE SKIS
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 70,000 Pieces
Production Hrs. Annual 2,016
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,370 2,123,095 kWh $0.08
Natural Gas $45,244 7,191 MMBtu $6.29
TOTAL ENERGY COSTS $209,614
RECOMMENDED SAVINGS* $45,018 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$19,753
Cost:
$28,865
$30,232 390,680 $(-10,479) (-1,666) $30,232
390,680
kWh
$(-10,479)
(-1,666)
MMBtu
02: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$5,240
Cost:
$8,712
- - $5,240 833 -
-
kWh
$5,240
833
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,441
Cost:
$5,370
- - $4,441 706 -
-
kWh
$4,441
706
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,359
Cost:
-
$3,359 43,376 - - $3,359
43,376
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$930
Cost:
$417
$930 12,016 - - $930
12,016
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,586
Cost:
$400
$2,586 33,411 - - $2,586
33,411
kWh
-
-
MMBtu
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$8,709
Cost:
$3,000
$8,709 112,544 - - $8,709
112,544
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,018
Cost:
$46,764
$45,816 592,027 $(-798) (-127) $45,816
592,027
kWh
$(-798)
(-127)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas