IAC logo
IAC Assessment: MA0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product MINIATURE BATTERIES
NAICS n/a
SIC 3692 - Primary Batteries, Dry And Wet
Sales $10,000,000-$50,000,000
# of Employees 440
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Pieces
Production Hrs. Annual 5,880
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,037,878 14,443,142 kWh $0.07
Fuel Oil #2 $139,442 35,280 MMBtu $3.95
Fuel Oil #4 $76,399 24,912 MMBtu $3.07
TOTAL ENERGY COSTS $1,253,719
RECOMMENDED SAVINGS* $121,308 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,112
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4
$ kWh $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$93,444
Cost:
$90,000
$93,444 - - - $93,444
-
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$668
Cost:
-
- - $668 186 -
-
kWh
$668
186
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$603
Cost:
$1,500
$603 9,672 - - $603
9,672
kWh
-
-
MMBtu
04: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$25,296
Cost:
$123,000
$38,870 577,374 $(-13,574) (-3,781) $38,870
577,374
kWh
$(-13,574)
(-3,781)
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,297
Cost:
$323
$1,297 18,171 - - $1,297
18,171
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$121,308
Cost:
$214,823
$134,214 605,217 $(-12,906) (-3,595) $134,214
605,217
kWh
$(-12,906)
(-3,595)
MMBtu
TOTAL IMPLEMENTED Savings:
$94,112
Cost:
$90,000
$93,444 - $668 186 $93,444
-
kWh
$668
186
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4