Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1990
Principal Product GLASS FIBER OPTIC WIRE
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 164,100 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $328,231 5,152,990 kWh $0.06
Fuel Oil #2 $899 140 MMBtu $6.42
TOTAL ENERGY COSTS $329,130
RECOMMENDED SAVINGS* $142,818 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,450
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$15,618
Cost:
$4,950
$15,618 245,311 - - - - $15,618
245,311
kWh
-
-
MMBtu
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$57,249
Cost:
$22,320
$57,249 899,179 - - - - $57,249
899,179
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,747
Cost:
$8,188
$5,747 90,270 - - - - $5,747
90,270
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$58,450
Cost:
$102,564
$97,517 1,531,653 $(-39,067) (-6,533) - - $97,517
1,531,653
kWh
$(-39,067)
(-6,533)
MMBtu
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$5,754
Cost:
$14,820
$1,325 20,809 - - $4,429 - $1,325
20,809
kWh
-
-
MMBtu
$4,429
-
$
TOTAL RECOMMENDED Savings:
$142,818
Cost:
$152,842
$177,456 2,787,222 $(-39,067) (-6,533) $4,429 - $177,456
2,787,222
kWh
$(-39,067)
(-6,533)
MMBtu
$4,429
-
$
TOTAL IMPLEMENTED Savings:
$58,450
Cost:
$102,564
$97,517 1,531,653 $(-39,067) (-6,533) - - $97,517
1,531,653
kWh
$(-39,067)
(-6,533)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes