IAC logo
IAC Assessment: MA0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product CORRUGATED CONTAINERS
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 89
Plant Area (Sq.Ft.) 0
Annual Production 336,000 Thousand Feet
Production Hrs. Annual 4,590
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,430 1,652,110 kWh $0.09
Natural Gas $36,241 9,141 MMBtu $3.96
LPG $5,560 40,304 MMBtu $0.14
Fuel Oil #4 $50,778 12,241 MMBtu $4.15
TOTAL ENERGY COSTS $233,009
RECOMMENDED SAVINGS* $33,136 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,136
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4
$ kWh $ MMBtu $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,259
Cost:
$14,186
$20,259 24,619 - - - - $20,259
24,619
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$10,773
Cost:
$45,415
- - $4,506 1,138 $6,267 1,509 -
-
kWh
$4,506
1,138
MMBtu
$6,267
1,509
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$498
Cost:
$145
$498 5,862 - - - - $498
5,862
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$864
Cost:
$473
$864 9,086 - - - - $864
9,086
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$742
Cost:
-
$742 8,792 - - - - $742
8,792
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$33,136
Cost:
$60,219
$22,363 48,359 $4,506 1,138 $6,267 1,509 $22,363
48,359
kWh
$4,506
1,138
MMBtu
$6,267
1,509
MMBtu
TOTAL IMPLEMENTED Savings:
$33,136
Cost:
$60,219
$22,363 48,359 $4,506 1,138 $6,267 1,509 $22,363
48,359
kWh
$4,506
1,138
MMBtu
$6,267
1,509
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #4 Electricity Usage Natural Gas Fuel Oil #4