IAC logo
IAC Assessment: MA0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product PRESSURE SENSITIVE LABEL
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 2,200 Tons
Production Hrs. Annual 4,160
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,545 1,760,258 kWh $0.09
Fuel Oil #4 $24,778 5,090 MMBtu $4.87
TOTAL ENERGY COSTS $179,323
RECOMMENDED SAVINGS* $23,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,245
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Administrative Changes Electricity Usage Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,264
Cost:
$200
$2,264 25,791 - - - - $2,264
25,791
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$926
Cost:
$176
$926 10,551 - - - - $926
10,551
kWh
-
-
MMBtu
-
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$6,561
Cost:
$13,960
$6,561 74,736 - - - - $6,561
74,736
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$952
Cost:
$170
$952 10,844 - - - - $952
10,844
kWh
-
-
MMBtu
-
-
$
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,682
Cost:
-
- - $5,162 1,060 $(-480) - -
-
kWh
$5,162
1,060
MMBtu
$(-480)
-
$
06: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$6,712
Cost:
$50,000
$746 8,499 $5,966 1,254 - - $746
8,499
kWh
$5,966
1,254
MMBtu
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,148
Cost:
-
- - $1,198 246 $(-50) - -
-
kWh
$1,198
246
MMBtu
$(-50)
-
$
TOTAL RECOMMENDED Savings:
$23,245
Cost:
$64,506
$11,449 130,421 $12,326 2,560 $(-530) - $11,449
130,421
kWh
$12,326
2,560
MMBtu
$(-530)
-
$
TOTAL IMPLEMENTED Savings:
$23,245
Cost:
$64,506
$11,449 130,421 $12,326 2,560 $(-530) - $11,449
130,421
kWh
$12,326
2,560
MMBtu
$(-530)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #4 Administrative Changes Electricity Usage Fuel Oil #4 Administrative Changes