Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1991 |
Principal Product | PRESSURE SENSITIVE LABEL |
NAICS | n/a |
SIC | 2759 - Commercial Printing, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 375 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,200 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $154,545 | 1,760,258 | kWh | $0.09 |
Fuel Oil #4 | $24,778 | 5,090 | MMBtu | $4.87 |
TOTAL ENERGY COSTS | $179,323 | |||
RECOMMENDED SAVINGS* | $23,245 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,245 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #4 | Administrative Changes | Electricity Usage | Fuel Oil #4 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,264 Cost: $200 |
$2,264 | 25,791 | - | - | - | - |
$2,264 25,791 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $926 Cost: $176 |
$926 | 10,551 | - | - | - | - |
$926 10,551 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $6,561 Cost: $13,960 |
$6,561 | 74,736 | - | - | - | - |
$6,561 74,736 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $952 Cost: $170 |
$952 | 10,844 | - | - | - | - |
$952 10,844 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $4,682 Cost: - |
- | - | $5,162 | 1,060 | $(-480) | - |
- - kWh |
$5,162 1,060 MMBtu |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $6,712 Cost: $50,000 |
$746 | 8,499 | $5,966 | 1,254 | - | - |
$746 8,499 kWh |
$5,966 1,254 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,148 Cost: - |
- | - | $1,198 | 246 | $(-50) | - |
- - kWh |
$1,198 246 MMBtu |
$(-50) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,245 Cost: $64,506 |
$11,449 | 130,421 | $12,326 | 2,560 | $(-530) | - | $11,449 130,421 kWh |
$12,326 2,560 MMBtu |
$(-530) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,245 Cost: $64,506 |
$11,449 | 130,421 | $12,326 | 2,560 | $(-530) | - | $11,449 130,421 kWh |
$12,326 2,560 MMBtu |
$(-530) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #4 | Administrative Changes | Electricity Usage | Fuel Oil #4 | Administrative Changes |