IAC Assessment: MA0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1992
Principal Product INJECT. MOLDED PLASTICS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 0
Annual Production 21,000,000 Pounds
Production Hrs. Annual 7,728
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $988,288 13,745,311 kWh $0.07
Natural Gas $40,661 6,371 MMBtu $6.38
TOTAL ENERGY COSTS $1,028,949
RECOMMENDED SAVINGS* $106,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$45,335
Cost:
$164,025
$13,843 192,556 $31,492 4,936 $13,843
192,556
kWh
$31,492
4,936
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$35,756
Cost:
-
$35,756 497,362 - - $35,756
497,362
kWh
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,589
Cost:
$31,600
$11,589 161,196 - - $11,589
161,196
kWh
-
-
MMBtu
04: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$9,355
Cost:
$29,200
$9,355 130,129 - - $9,355
130,129
kWh
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,908
Cost:
$785
- - $1,908 299 -
-
kWh
$1,908
299
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,285
Cost:
$320
$1,285 17,878 - - $1,285
17,878
kWh
-
-
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$780
Cost:
$330
$780 10,844 - - $780
10,844
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$106,008
Cost:
$226,260
$72,608 1,009,965 $33,400 5,235 $72,608
1,009,965
kWh
$33,400
5,235
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas