IAC logo
IAC Assessment: MA0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1993
Principal Product Fish Fillets
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 36,608
Annual Production 1,300,000 Pounds
Production Hrs. Annual 8,736
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,747 1,728,312 kWh $0.06
LPG $42,754 5,251 MMBtu $8.14
TOTAL ENERGY COSTS $154,501
RECOMMENDED SAVINGS* $68,679 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,063
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2514 COVER OPEN TANKS Savings:
$7,538
Cost:
$5,000
- - $7,538 926 - - -
-
kWh
$7,538
926
MMBtu
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,788
Cost:
$12,305
$7,788 120,457 - - - - $7,788
120,457
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,525
Cost:
$12,420
$3,525 54,513 - - - - $3,525
54,513
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$114
Cost:
$85
$114 1,758 - - - - $114
1,758
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$49,714
Cost:
$17,787
$180,337 2,076,202 $37,582 4,617 $(-168,205) (-20,199) $180,337
2,076,202
kWh
$37,582
4,617
MMBtu
$(-168,205)
(-20,199)
MMBtu
TOTAL RECOMMENDED Savings:
$68,679
Cost:
$47,597
$191,764 2,252,930 $45,120 5,543 $(-168,205) (-20,199) $191,764
2,252,930
kWh
$45,120
5,543
MMBtu
$(-168,205)
(-20,199)
MMBtu
TOTAL IMPLEMENTED Savings:
$11,063
Cost:
$17,420
$3,525 54,513 $7,538 926 - - $3,525
54,513
kWh
$7,538
926
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2