Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1994 |
Principal Product | fact booklets |
NAICS | n/a |
SIC | 2731 - Book Publishing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 97,621 |
Annual Production | 1,400,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $244,829 | 1,659,437 | kWh | $0.15 |
Natural Gas | $51,604 | 9,235 | MMBtu | $5.59 |
Fuel Oil #2 | $9,525 | 2,100 | MMBtu | $4.54 |
TOTAL ENERGY COSTS | $305,958 | |||
RECOMMENDED SAVINGS* | $75,924 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,462 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $18,419 Cost: $10,078 |
- | - | $18,419 | 3,295 | - | - | - | - | - | - |
- - kWh |
$18,419 3,295 MMBtu |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,978 Cost: $14,015 |
$4,978 | 55,393 | - | - | - | - | - | - | - | - |
$4,978 55,393 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7424 SHADE WINDOWS FROM SUMMER SUN |
Savings: $15,022 Cost: $41,394 |
$15,022 | 588,511 | - | - | - | - | - | - | - | - |
$15,022 588,511 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $1,508 Cost: $5,569 |
- | - | - | - | $1,508 | 483 | - | - | - | - |
- - kWh |
- - MMBtu |
$1,508 483 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $698 Cost: - |
$698 | 7,913 | - | - | - | - | - | - | - | - |
$698 7,913 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $764 Cost: $180 |
$764 | 8,499 | - | - | - | - | - | - | - | - |
$764 8,499 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT |
Savings: $24,185 Cost: $2,500 |
- | - | - | - | - | - | $24,185 | 4,084 | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$24,185 4,084 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $10,350 Cost: $385 |
- | - | - | - | - | - | - | - | $10,350 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - gal |
$10,350 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,924 Cost: $74,121 |
$21,462 | 660,316 | $18,419 | 3,295 | $1,508 | 483 | $24,185 | 4,084 | $10,350 | - | $21,462 660,316 kWh |
$18,419 3,295 MMBtu |
$1,508 483 MMBtu |
$24,185 4,084 gal |
$10,350 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,462 Cost: $180 |
$1,462 | 16,412 | - | - | - | - | - | - | - | - | $1,462 16,412 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Liquid (haz) | Solid Waste (non-haz) |