IAC logo
IAC Assessment: MA0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product fact booklets
NAICS n/a
SIC 2731 - Book Publishing
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 97,621
Annual Production 1,400,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,829 1,659,437 kWh $0.15
Natural Gas $51,604 9,235 MMBtu $5.59
Fuel Oil #2 $9,525 2,100 MMBtu $4.54
TOTAL ENERGY COSTS $305,958
RECOMMENDED SAVINGS* $75,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,462
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ MMBtu $ MMBtu $ gal $ lb
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$18,419
Cost:
$10,078
- - $18,419 3,295 - - - - - - -
-
kWh
$18,419
3,295
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,978
Cost:
$14,015
$4,978 55,393 - - - - - - - - $4,978
55,393
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.7424 SHADE WINDOWS FROM SUMMER SUN Savings:
$15,022
Cost:
$41,394
$15,022 588,511 - - - - - - - - $15,022
588,511
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,508
Cost:
$5,569
- - - - $1,508 483 - - - - -
-
kWh
-
-
MMBtu
$1,508
483
MMBtu
-
-
gal
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$698
Cost:
-
$698 7,913 - - - - - - - - $698
7,913
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$764
Cost:
$180
$764 8,499 - - - - - - - - $764
8,499
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
07: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$24,185
Cost:
$2,500
- - - - - - $24,185 4,084 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$24,185
4,084
gal
-
-
lb
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,350
Cost:
$385
- - - - - - - - $10,350 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
$10,350
-
lb
TOTAL RECOMMENDED Savings:
$75,924
Cost:
$74,121
$21,462 660,316 $18,419 3,295 $1,508 483 $24,185 4,084 $10,350 - $21,462
660,316
kWh
$18,419
3,295
MMBtu
$1,508
483
MMBtu
$24,185
4,084
gal
$10,350
-
lb
TOTAL IMPLEMENTED Savings:
$1,462
Cost:
$180
$1,462 16,412 - - - - - - - - $1,462
16,412
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ gal $ lb
Electricity Usage Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Natural Gas Fuel Oil #2 Other Liquid (haz) Solid Waste (non-haz)