Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | firearms |
NAICS | n/a |
SIC | 3484 - Small Arms |
Sales | $10,000,000-$50,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 5,268 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,002,478 | 9,609,906 | kWh | $0.10 |
Natural Gas | $261,462 | 35,350 | MMBtu | $7.40 |
TOTAL ENERGY COSTS | $1,282,610 | |||
RECOMMENDED SAVINGS* | $36,512 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,247 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,139 Cost: - |
$10,139 | 97,304 | - | - | - | - | - | - | - | - | - | - |
$10,139 97,304 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,782 Cost: $29,500 |
$9,782 | 93,787 | - | - | - | - | - | - | - | - | - | - |
$9,782 93,787 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $6,022 Cost: $1,120 |
$6,022 | 57,737 | - | - | - | - | - | - | - | - | - | - |
$6,022 57,737 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,019 Cost: $2,605 |
- | - | $1,019 | 137 | - | - | - | - | - | - | - | - |
- - kWh |
$1,019 137 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $610 Cost: $490 |
$610 | 5,862 | - | - | - | - | - | - | - | - | - | - |
$610 5,862 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $4,873 Cost: $6,384 |
- | - | - | - | - | - | - | - | $(-2,568) | (-66,913) | $7,441 | 66,913 |
- - kWh |
- - MMBtu |
- - Tgal |
- - gal |
$(-2,568) (-66,913) lb |
$7,441 66,913 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $3,553 Cost: - |
- | - | - | - | - | - | $3,553 | 3,602 | - | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$3,553 3,602 gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $514 Cost: - |
- | - | - | - | $514 | 220,404 | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$514 220,404 Tgal |
- - gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,512 Cost: $40,099 |
$26,553 | 254,690 | $1,019 | 137 | $514 | 220,404 | $3,553 | 3,602 | $(-2,568) | (-66,913) | $7,441 | 66,913 | $26,553 254,690 kWh |
$1,019 137 MMBtu |
$514 220,404 Tgal |
$3,553 3,602 gal |
$(-2,568) (-66,913) lb |
$7,441 66,913 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,247 Cost: $3,725 |
$16,161 | 155,041 | $1,019 | 137 | $514 | 220,404 | $3,553 | 3,602 | - | - | - | - | $16,161 155,041 kWh |
$1,019 137 MMBtu |
$514 220,404 Tgal |
$3,553 3,602 gal |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Solid Waste (haz) |