Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | Printings and lithographies |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $5,000,000-$10,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 36,900 |
Annual Production | 12,000 Pieces |
Production Hrs. Annual | 3,172 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $126,114 | 976,846 | kWh | $0.13 |
Natural Gas | $28,239 | 3,260 | MMBtu | $8.66 |
TOTAL ENERGY COSTS | $154,353 | |||
RECOMMENDED SAVINGS* | $5,706 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,176 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $1,707 Cost: - |
- | - | - | - | $1,707 | - |
- - kWh |
- - MMBtu |
$1,707 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,207 Cost: $1,440 |
$1,207 | 13,775 | - | - | - | - |
$1,207 13,775 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8112 COMBINE UTILITY METERS |
Savings: $1,091 Cost: $200 |
- | - | - | - | $1,091 | - |
- - kWh |
- - MMBtu |
$1,091 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $721 Cost: - |
$721 | 5,862 | - | - | - | - |
$721 5,862 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $511 Cost: $711 |
- | - | $511 | 56 | - | - |
- - kWh |
$511 56 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $469 Cost: $400 |
- | - | $469 | 250 | - | - |
- - kWh |
$469 250 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,706 Cost: $2,751 |
$1,928 | 19,637 | $980 | 306 | $2,798 | - | $1,928 19,637 kWh |
$980 306 MMBtu |
$2,798 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,176 Cost: $400 |
- | - | $469 | 250 | $1,707 | - | - - kWh |
$469 250 MMBtu |
$1,707 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |