IAC Assessment: MA0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product Printings and lithographies
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 42
Plant Area (Sq.Ft.) 36,900
Annual Production 12,000 Pieces
Production Hrs. Annual 3,172
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,114 976,846 kWh $0.13
Natural Gas $28,239 3,260 MMBtu $8.66
TOTAL ENERGY COSTS $154,353
RECOMMENDED SAVINGS* $5,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,176
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,707
Cost:
-
- - - - $1,707 - -
-
kWh
-
-
MMBtu
$1,707
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,207
Cost:
$1,440
$1,207 13,775 - - - - $1,207
13,775
kWh
-
-
MMBtu
-
-
$
03: 2.8112 COMBINE UTILITY METERS Savings:
$1,091
Cost:
$200
- - - - $1,091 - -
-
kWh
-
-
MMBtu
$1,091
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$721
Cost:
-
$721 5,862 - - - - $721
5,862
kWh
-
-
MMBtu
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$511
Cost:
$711
- - $511 56 - - -
-
kWh
$511
56
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$469
Cost:
$400
- - $469 250 - - -
-
kWh
$469
250
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,706
Cost:
$2,751
$1,928 19,637 $980 306 $2,798 - $1,928
19,637
kWh
$980
306
MMBtu
$2,798
-
$
TOTAL IMPLEMENTED Savings:
$2,176
Cost:
$400
- - $469 250 $1,707 - -
-
kWh
$469
250
MMBtu
$1,707
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes