IAC logo
IAC Assessment: MA0349
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product Extruded brush fiber
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 110,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,048
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $922,997 12,249,707 kWh $0.08
Natural Gas $59,890 11,699 MMBtu $5.12
LPG $8,285 788 MMBtu $10.51
TOTAL ENERGY COSTS $991,172
RECOMMENDED SAVINGS* $75,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,977
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$47,119
Cost:
$20,700
$47,119 625,440 - - - - $47,119
625,440
kWh
-
-
MMBtu
-
-
Tgal
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$25,737
Cost:
$27,186
$(-1,899) (-25,205) - - $27,636 903,200 $(-1,899)
(-25,205)
kWh
-
-
MMBtu
$27,636
903,200
Tgal
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$858
Cost:
$1,700
$1,236 16,413 $(-378) (-71) - - $1,236
16,413
kWh
$(-378)
(-71)
MMBtu
-
-
Tgal
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$777
Cost:
$2,600
- - $777 145 - - -
-
kWh
$777
145
MMBtu
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$571
Cost:
$127
$571 7,913 - - - - $571
7,913
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$75,062
Cost:
$52,313
$47,027 624,561 $399 74 $27,636 903,200 $47,027
624,561
kWh
$399
74
MMBtu
$27,636
903,200
Tgal
TOTAL IMPLEMENTED Savings:
$47,977
Cost:
$22,400
$48,355 641,853 $(-378) (-71) - - $48,355
641,853
kWh
$(-378)
(-71)
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal