Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product looseleaf binders
NAICS n/a
SIC 2782 - Blankbooks And Looseleaf Binders
Sales $10,000,000-$50,000,000
# of Employees 117
Plant Area (Sq.Ft.) 205,000
Annual Production 1,818,181 Pieces
Production Hrs. Annual 3,379
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,080 2,002,345 kWh $0.08
Electricity Demand $18,237 7,069 kW-months/year $2.58
Electricity Fees $7,864 - $ -
Other Energy $29,619 31,000 MMBtu $0.96
TOTAL ENERGY COSTS $214,644
RECOMMENDED SAVINGS* $36,002 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,882
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$29,400
Cost:
$118,450
- - - - $29,400 727 -
-
kWh
-
-
MMBtu
$29,400
727
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,644
Cost:
$3,000
$2,644 36,928 - - - - $2,644
36,928
kWh
-
-
MMBtu
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,838
Cost:
-
$1,838 24,033 - - - - $1,838
24,033
kWh
-
-
MMBtu
-
-
lb
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,672
Cost:
$10,000
$2,784 32,532 $(-1,112) (-139) - - $2,784
32,532
kWh
$(-1,112)
(-139)
MMBtu
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$448
Cost:
-
$448 5,862 - - - - $448
5,862
kWh
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$36,002
Cost:
$131,450
$7,714 99,355 $(-1,112) (-139) $29,400 727 $7,714
99,355
kWh
$(-1,112)
(-139)
MMBtu
$29,400
727
lb
TOTAL IMPLEMENTED Savings:
$33,882
Cost:
$121,450
$4,482 60,961 - - $29,400 727 $4,482
60,961
kWh
-
-
MMBtu
$29,400
727
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)