IAC Assessment: MA0365
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0365
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product Saw Blades
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 65,792
Annual Production 4,200 Pieces
Production Hrs. Annual 2,125
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,054 2,443,435 kWh $0.03
Electricity Demand $158,071 10,120 kW-months/year $15.62
Electricity Fees $72,874 - $ -
Natural Gas $26,337 4,131 MMBtu $6.38
TOTAL ENERGY COSTS $341,336
RECOMMENDED SAVINGS* $38,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,670
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$15,805
Cost:
$20,000
$15,805 101,993 - - - - - - $15,805
101,993
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$9,443
Cost:
-
$9,443 92,321 - - - - - - $9,443
92,321
kWh
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,539
Cost:
$840
$4,539 67,995 - - - - - - $4,539
67,995
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$4,290
Cost:
-
- - - - - - $4,290 - -
-
kWh
-
-
MMBtu
-
-
lb
$4,290
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,173
Cost:
$876
- - $2,173 393 - - - - -
-
kWh
$2,173
393
MMBtu
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,330
Cost:
$640
$1,330 19,930 - - - - - - $1,330
19,930
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$420
Cost:
-
- - - - - - $420 - -
-
kWh
-
-
MMBtu
-
-
lb
$420
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$345
Cost:
-
- - - - $345 585 - - -
-
kWh
-
-
MMBtu
$345
585
lb
-
-
$
TOTAL RECOMMENDED Savings:
$38,345
Cost:
$22,356
$31,117 282,239 $2,173 393 $345 585 $4,710 - $31,117
282,239
kWh
$2,173
393
MMBtu
$345
585
lb
$4,710
-
$
TOTAL IMPLEMENTED Savings:
$36,670
Cost:
$21,716
$29,787 262,309 $2,173 393 - - $4,710 - $29,787
262,309
kWh
$2,173
393
MMBtu
-
-
lb
$4,710
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes