Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1996 |
Principal Product | Saw Blades |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 65,792 |
Annual Production | 4,200 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,054 | 2,443,435 | kWh | $0.03 |
Electricity Demand | $158,071 | 10,120 | kW-months/year | $15.62 |
Electricity Fees | $72,874 | - | $ | - |
Natural Gas | $26,337 | 4,131 | MMBtu | $6.38 |
TOTAL ENERGY COSTS | $341,336 | |||
RECOMMENDED SAVINGS* | $38,345 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,670 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $15,805 Cost: $20,000 |
$15,805 | 101,993 | - | - | - | - | - | - |
$15,805 101,993 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $9,443 Cost: - |
$9,443 | 92,321 | - | - | - | - | - | - |
$9,443 92,321 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,539 Cost: $840 |
$4,539 | 67,995 | - | - | - | - | - | - |
$4,539 67,995 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $4,290 Cost: - |
- | - | - | - | - | - | $4,290 | - |
- - kWh |
- - MMBtu |
- - lb |
$4,290 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,173 Cost: $876 |
- | - | $2,173 | 393 | - | - | - | - |
- - kWh |
$2,173 393 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,330 Cost: $640 |
$1,330 | 19,930 | - | - | - | - | - | - |
$1,330 19,930 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8112 COMBINE UTILITY METERS |
Savings: $420 Cost: - |
- | - | - | - | - | - | $420 | - |
- - kWh |
- - MMBtu |
- - lb |
$420 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $345 Cost: - |
- | - | - | - | $345 | 585 | - | - |
- - kWh |
- - MMBtu |
$345 585 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,345 Cost: $22,356 |
$31,117 | 282,239 | $2,173 | 393 | $345 | 585 | $4,710 | - | $31,117 282,239 kWh |
$2,173 393 MMBtu |
$345 585 lb |
$4,710 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,670 Cost: $21,716 |
$29,787 | 262,309 | $2,173 | 393 | - | - | $4,710 | - | $29,787 262,309 kWh |
$2,173 393 MMBtu |
- - lb |
$4,710 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes |