IAC logo
IAC Assessment: MA0370
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0370
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product plastic automotive parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 216
Plant Area (Sq.Ft.) 48,000
Annual Production 1,417,500 Pieces
Production Hrs. Annual 6,000
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $669,901 8,450,469 kWh $0.08
Electricity Demand $70,892 9,009 kW-months/year $7.87
Electricity Fees $2,533 - $ -
Natural Gas $59,729 12,195 MMBtu $4.90
LPG $120,006 18,717 MMBtu $6.41
TOTAL ENERGY COSTS $923,061
RECOMMENDED SAVINGS* $421,298 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Primary Raw Material By-product Production Electricity Usage Natural Gas Personnel Changes Primary Raw Material By-product Production
$ kWh $ MMBtu $ $ $ $ $ $
01: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$321,166
Cost:
$27,000
$(-1,134) (-14,947) - - $(-30,000) - $379,400 - $(-27,100) - $(-1,134)
(-14,947)
kWh
-
-
MMBtu
$(-30,000)
-
$
$379,400
-
$
$(-27,100)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$52,771
Cost:
$146,000
$52,771 665,006 - - - - - - - - $52,771
665,006
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,513
Cost:
$32,940
$20,513 258,499 - - - - - - - - $20,513
258,499
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,249
Cost:
$90,000
$20,699 260,844 $(-4,450) (-989) - - - - - - $20,699
260,844
kWh
$(-4,450)
(-989)
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,599
Cost:
$18,000
$13,722 172,919 $(-3,123) (-694) - - - - - - $13,722
172,919
kWh
$(-3,123)
(-694)
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$421,298
Cost:
$313,940
$106,571 1,342,321 $(-7,573) (-1,683) $(-30,000) - $379,400 - $(-27,100) - $106,571
1,342,321
kWh
$(-7,573)
(-1,683)
MMBtu
$(-30,000)
-
$
$379,400
-
$
$(-27,100)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Primary Raw Material By-product Production Electricity Usage Natural Gas Personnel Changes Primary Raw Material By-product Production