IAC logo
IAC Assessment: MA0377
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0377
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product Plating
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 52
Plant Area (Sq.Ft.) 35,000
Annual Production 100,000 Pounds
Production Hrs. Annual 6,257
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,478 3,036,929 kWh $0.03
Electricity Demand $86,636 9,025 kW-months/year $9.60
Electricity Fees $74,535 - $ -
Natural Gas $113,572 20,805 MMBtu $5.46
TOTAL ENERGY COSTS $380,316
RECOMMENDED SAVINGS* $81,854 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,363
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$70,000
Cost:
$198,000
- - - - - - - - $70,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$70,000
-
Tgal
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$6,407
Cost:
$3,770
$6,371 151,817 $36 4 - - - - - - $6,371
151,817
kWh
$36
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$3,363
Cost:
-
- - - - - - $3,363 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,363
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,650
Cost:
$1,220
- - - - $1,650 290 - - - - -
-
kWh
-
-
kW-months/year
$1,650
290
MMBtu
-
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$434
Cost:
$174
$434 10,258 - - - - - - - - $434
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$81,854
Cost:
$203,164
$6,805 162,075 $36 4 $1,650 290 $3,363 - $70,000 - $6,805
162,075
kWh
$36
4
kW-months/year
$1,650
290
MMBtu
$3,363
-
$
$70,000
-
Tgal
TOTAL IMPLEMENTED Savings:
$3,363
Cost:
-
- - - - - - $3,363 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,363
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Administrative Changes Water Consumption