IAC logo
IAC Assessment: MA0381
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0381
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Plastic Fastners
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 153
Plant Area (Sq.Ft.) 78,872
Annual Production 2,750,000 Pounds
Production Hrs. Annual 8,400
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $563,232 8,708,382 kWh $0.06
Electricity Demand $149,552 21,686 kW-months/year $6.90
Electricity Fees $443 - $ -
Natural Gas $16,711 2,840 MMBtu $5.88
TOTAL ENERGY COSTS $743,186
RECOMMENDED SAVINGS* $143,524 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $104,052
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
01: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$62,985
Cost:
$16,000
- - - - - - - - $62,985 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$62,985
-
$
-
-
$
-
-
%
02: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$21,374
Cost:
$1,500
- - - - - - - - - - - - $21,374 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$21,374
-
%
03: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$2,000
Cost:
-
- - - - - - - - - - - - $2,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$2,000
-
%
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$28,307
Cost:
$65,000
$41,029 634,232 $1,042 151 $(-13,764) (-2,369) - - - - - - - - $41,029
634,232
kWh
$1,042
151
kW-months/year
$(-13,764)
(-2,369)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$6,350
Cost:
$9,100
- - - - $6,350 1,093 - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,350
1,093
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,560
Cost:
$4,280
$2,560 39,566 - - - - - - - - - - - - $2,560
39,566
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,143
Cost:
$900
- - - - $3,143 541 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,143
541
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,757
Cost:
$9,700
$4,757 62,427 - - - - - - - - - - - - $4,757
62,427
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$10,200
Cost:
-
- - - - - - - - - - $10,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$10,200
-
$
-
-
%
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,848
Cost:
-
- - - - - - $1,848 288,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,848
288,000
lb
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$143,524
Cost:
$106,480
$48,346 736,225 $1,042 151 $(-4,271) (-735) $1,848 288,000 $62,985 - $10,200 - $23,374 - $48,346
736,225
kWh
$1,042
151
kW-months/year
$(-4,271)
(-735)
MMBtu
$1,848
288,000
lb
$62,985
-
$
$10,200
-
$
$23,374
-
%
TOTAL IMPLEMENTED Savings:
$104,052
Cost:
$85,280
$43,589 673,798 $1,042 151 $(-13,764) (-2,369) - - $62,985 - $10,200 - - - $43,589
673,798
kWh
$1,042
151
kW-months/year
$(-13,764)
(-2,369)
MMBtu
-
-
lb
$62,985
-
$
$10,200
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production