Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | Printed and Embossed PVC Sheet |
NAICS | n/a |
SIC | 3081 - Unsupported Plastics Film & Sheet |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 50,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $350,515 | 11,441,384 | kWh | $0.03 |
Electricity Demand | $235,480 | 24,024 | kW-months/year | $9.80 |
Electricity Fees | $316,732 | - | $ | - |
Natural Gas | $221,844 | 50,487 | MMBtu | $4.39 |
Fuel Oil #4 | $171,557 | 39,990 | MMBtu | $4.29 |
TOTAL ENERGY COSTS | $1,467,808 | |||
RECOMMENDED SAVINGS* | $714,746 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,963 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | Other Liquid (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,954 Cost: $1,527 |
- | - | - | - | $989 | 225 | $965 | 225 | - | - | - | - |
- - kWh |
- - kW-months/year |
$989 225 MMBtu |
$965 225 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $2,296 Cost: $5,000 |
- | - | $2,296 | 232 | - | - | - | - | - | - | - | - |
- - kWh |
$2,296 232 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.8137 USE SOY OR WATER-BASED INKS |
Savings: $240,201 Cost: $300,000 |
- | - | - | - | $80,201 | 18,252 | - | - | $160,000 | 56,338 | - | - |
- - kWh |
- - kW-months/year |
$80,201 18,252 MMBtu |
- - MMBtu |
$160,000 56,338 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION |
Savings: $457,830 Cost: $754,000 |
$264,159 | 4,411,196 | $62,244 | 6,300 | - | - | $40,177 | 10,080 | - | - | $91,250 | - |
$264,159 4,411,196 kWh |
$62,244 6,300 kW-months/year |
- - MMBtu |
$40,177 10,080 MMBtu |
- - gal |
$91,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,752 Cost: $13,700 |
$2,910 | 48,652 | - | - | $3,968 | 903 | $3,874 | 903 | - | - | - | - |
$2,910 48,652 kWh |
- - kW-months/year |
$3,968 903 MMBtu |
$3,874 903 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,713 Cost: $200 |
$1,713 | 31,653 | - | - | - | - | - | - | - | - | - | - |
$1,713 31,653 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $714,746 Cost: $1,074,427 |
$268,782 | 4,491,501 | $64,540 | 6,532 | $85,158 | 19,380 | $45,016 | 11,208 | $160,000 | 56,338 | $91,250 | - | $268,782 4,491,501 kWh |
$64,540 6,532 kW-months/year |
$85,158 19,380 MMBtu |
$45,016 11,208 MMBtu |
$160,000 56,338 gal |
$91,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,963 Cost: $6,727 |
$1,713 | 31,653 | $2,296 | 232 | $989 | 225 | $965 | 225 | - | - | - | - | $1,713 31,653 kWh |
$2,296 232 kW-months/year |
$989 225 MMBtu |
$965 225 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | Other Liquid (haz) | Administrative Changes |