IAC logo
IAC Assessment: MA0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Pewter and Resin Figurines
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 111
Plant Area (Sq.Ft.) 41,600
Annual Production 280,000 Pounds
Production Hrs. Annual 2,660
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,826 604,924 kWh $0.05
Natural Gas $25,795 4,398 MMBtu $5.87
TOTAL ENERGY COSTS $56,621
RECOMMENDED SAVINGS* $466,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ MMBtu $ lb $ $
01: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$315,000
Cost:
-
- - - - - - $315,000 - -
-
kWh
-
-
MMBtu
-
-
lb
$315,000
-
$
02: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$137,850
Cost:
$15,000
- - - - - - $137,850 - -
-
kWh
-
-
MMBtu
-
-
lb
$137,850
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$9,089
Cost:
$3,215
- - $9,089 1,548 - - - - -
-
kWh
$9,089
1,548
MMBtu
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,348
Cost:
$6,625
- - - - $4,348 - - - -
-
kWh
-
-
MMBtu
$4,348
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$290
Cost:
$364
$290 5,275 - - - - - - $290
5,275
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$408
Cost:
$861
$408 6,741 - - - - - - $408
6,741
kWh
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$466,985
Cost:
$26,065
$698 12,016 $9,089 1,548 $4,348 - $452,850 - $698
12,016
kWh
$9,089
1,548
MMBtu
$4,348
-
lb
$452,850
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Primary Product