IAC logo
IAC Assessment: MA0386
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0386
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Coated Plastic Film
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 500,000
Annual Production 11,000 Pieces
Production Hrs. Annual 8,760
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $813,425 9,674,678 kWh $0.08
Electricity Demand $118,951 22,053 kW-months/year $5.39
Natural Gas $839,457 271,689 MMBtu $3.09
TOTAL ENERGY COSTS $1,855,753
RECOMMENDED SAVINGS* $271,952 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ Tgal $ gal $ gal $ lb $ $
01: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION Savings:
$194,188
Cost:
$908,000
$361,696 4,600,528 $114,996 40,924 - - - - - - - - $(-282,504) - $361,696
4,600,528
kWh
$114,996
40,924
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
$(-282,504)
-
$
02: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$42,000
Cost:
-
- - - - - - - - - - $42,000 700 - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
$42,000
700
lb
-
-
$
03: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$15,024
Cost:
$22,219
$(-421) (-6,741) - - $15,745 1,149,266 - - $(-300) (-50) - - - - $(-421)
(-6,741)
kWh
-
-
MMBtu
$15,745
1,149,266
Tgal
-
-
gal
$(-300)
(-50)
gal
-
-
lb
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$11,103
Cost:
$20,180
$13,213 211,606 - - $(-2,110) (-154,011) - - - - - - - - $13,213
211,606
kWh
-
-
MMBtu
$(-2,110)
(-154,011)
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
05: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER Savings:
$7,800
Cost:
$11,240
- - - - - - $7,800 312 - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$7,800
312
gal
-
-
gal
-
-
lb
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,837
Cost:
$3,215
$418 5,862 $1,419 505 - - - - - - - - - - $418
5,862
kWh
$1,419
505
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$271,952
Cost:
$964,854
$374,906 4,811,255 $116,415 41,429 $13,635 995,255 $7,800 312 $(-300) (-50) $42,000 700 $(-282,504) - $374,906
4,811,255
kWh
$116,415
41,429
MMBtu
$13,635
995,255
Tgal
$7,800
312
gal
$(-300)
(-50)
gal
$42,000
700
lb
$(-282,504)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ gal $ gal $ lb $ $
Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes