IAC logo
IAC Assessment: MA0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product High quality Injection Molded Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 360,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,596 5,576,495 kWh $0.06
Electricity Demand $139,855 13,975 kW-months/year $10.01
Electricity Fees $6,506 - $ -
Natural Gas $30,557 5,582 MMBtu $5.47
TOTAL ENERGY COSTS $527,062
RECOMMENDED SAVINGS* $27,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,319
Cost:
$11,700
$10,185 129,543 $2,134 216 - - - - $10,185
129,543
kWh
$2,134
216
kW-months/year
-
-
gal
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$5,709
Cost:
-
- - - - - - $5,709 - -
-
kWh
-
-
kW-months/year
-
-
gal
$5,709
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,435
Cost:
$9,975
- - $4,435 449 - - - - -
-
kWh
$4,435
449
kW-months/year
-
-
gal
-
-
$
04: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$3,585
Cost:
$480
- - - - - - $3,585 - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,585
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$852
Cost:
$999
$852 13,482 - - - - - - $852
13,482
kWh
-
-
kW-months/year
-
-
gal
-
-
$
06: 3.8133 CONVERT TO AQUEOUS CLEANING Savings:
$548
Cost:
-
- - - - $548 400 - - -
-
kWh
-
-
kW-months/year
$548
400
gal
-
-
$
TOTAL RECOMMENDED Savings:
$27,448
Cost:
$23,154
$11,037 143,025 $6,569 665 $548 400 $9,294 - $11,037
143,025
kWh
$6,569
665
kW-months/year
$548
400
gal
$9,294
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes