IAC Assessment: MA0392
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0392
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product metal castings
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 110,000
Annual Production 500 Tons
Production Hrs. Annual 2,250
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,514 1,839,097 kWh $0.04
Electricity Demand $95,161 15,972 kW-months/year $5.96
Natural Gas $67,663 10,010 MMBtu $6.76
TOTAL ENERGY COSTS $232,614
RECOMMENDED SAVINGS* $45,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 4.5220 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$34,500
Cost:
$21,950
- - - - - - - - $34,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$34,500
-
$
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$8,500
Cost:
$3,000
- - - - $5,500 760 - - $3,000 - -
-
kWh
-
-
kW-months/year
$5,500
760
MMBtu
-
-
gal
$3,000
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,388
Cost:
$6,000
$1,049 16,413 $1,845 192 $(-506) (-70) - - - - $1,049
16,413
kWh
$1,845
192
kW-months/year
$(-506)
(-70)
MMBtu
-
-
gal
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$320
Cost:
$268
$320 4,982 - - - - - - - - $320
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 3.8133 CONVERT TO AQUEOUS CLEANING Savings:
$276
Cost:
$759
- - - - - - $276 60 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$276
60
gal
-
-
$
TOTAL RECOMMENDED Savings:
$45,984
Cost:
$31,977
$1,369 21,395 $1,845 192 $4,994 690 $276 60 $37,500 - $1,369
21,395
kWh
$1,845
192
kW-months/year
$4,994
690
MMBtu
$276
60
gal
$37,500
-
$
TOTAL IMPLEMENTED Savings:
$35,096
Cost:
$22,977
$320 4,982 - - - - $276 60 $34,500 - $320
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
$276
60
gal
$34,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes