IAC Assessment: MA0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Plating
NAICS n/a
SIC 3471 - Plating And Polishing
Sales n/a
# of Employees 66
Plant Area (Sq.Ft.) 56,898
Annual Production 0 Units
Production Hrs. Annual 8,112
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,365 2,576,788 kWh $0.05
Electricity Demand $96,168 5,796 kW-months/year $16.59
Natural Gas $138,984 31,096 MMBtu $4.47
TOTAL ENERGY COSTS $360,517
RECOMMENDED SAVINGS* $381,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,065
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$347,702
Cost:
$505,000
- - - - - - $84,300 542,000 - - $182,321 - $81,081 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$84,300
542,000
lb
-
-
$
$182,321
-
$
$81,081
-
Tgal
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$17,497
Cost:
$92,676
$85,388 2,589,977 $67,536 4,200 $(-42,751) (-14,156) - - $(-92,676) - - - - - $85,388
2,589,977
kWh
$67,536
4,200
kW-months/year
$(-42,751)
(-14,156)
MMBtu
-
-
lb
$(-92,676)
-
$
-
-
$
-
-
Tgal
03: 2.2514 COVER OPEN TANKS Savings:
$15,677
Cost:
$6,578
- - - - $15,677 4,570 - - - - - - - - -
-
kWh
-
-
kW-months/year
$15,677
4,570
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$605
Cost:
$970
$17 586 - - $588 171 - - - - - - - - $17
586
kWh
-
-
kW-months/year
$588
171
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$388
Cost:
-
$388 14,361 - - - - - - - - - - - - $388
14,361
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$381,869
Cost:
$605,224
$85,793 2,604,924 $67,536 4,200 $(-26,486) (-9,415) $84,300 542,000 $(-92,676) - $182,321 - $81,081 - $85,793
2,604,924
kWh
$67,536
4,200
kW-months/year
$(-26,486)
(-9,415)
MMBtu
$84,300
542,000
lb
$(-92,676)
-
$
$182,321
-
$
$81,081
-
Tgal
TOTAL IMPLEMENTED Savings:
$16,065
Cost:
$6,578
$388 14,361 - - $15,677 4,570 - - - - - - - - $388
14,361
kWh
-
-
kW-months/year
$15,677
4,570
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Primary Raw Material Water Consumption