Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | Printed Circuit Boards an Insulated Fiberglass Boards |
NAICS | n/a |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 12,000 Thousand Feet |
Production Hrs. Annual | 7,140 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $392,282 | 5,848,769 | kWh | $0.07 |
Electricity Demand | $162,387 | 13,111 | kW-months/year | $12.39 |
LPG | $325,892 | 60,456 | MMBtu | $5.39 |
TOTAL ENERGY COSTS | $880,561 | |||
RECOMMENDED SAVINGS* | $294,724 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | LPG | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $217,449 Cost: $140,000 |
$109,213 | 1,655,041 | $137,826 | 11,124 | $(-29,590) | (-6,138) | - | - | - | - |
$109,213 1,655,041 kWh |
$137,826 11,124 kW-months/year |
$(-29,590) (-6,138) MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $61,092 Cost: $16,597 |
$2,592 | 39,273 | - | - | - | - | - | - | $58,500 | - |
$2,592 39,273 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$58,500 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,628 Cost: $6,075 |
$7,628 | 115,475 | - | - | - | - | - | - | - | - |
$7,628 115,475 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,721 Cost: $4,925 |
$4,721 | 71,219 | - | - | - | - | - | - | - | - |
$4,721 71,219 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,577 Cost: $4,275 |
- | - | - | - | - | - | $2,577 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,577 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,257 Cost: $200 |
$1,257 | 19,050 | - | - | - | - | - | - | - | - |
$1,257 19,050 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $294,724 Cost: $172,072 |
$125,411 | 1,900,058 | $137,826 | 11,124 | $(-29,590) | (-6,138) | $2,577 | - | $58,500 | - | $125,411 1,900,058 kWh |
$137,826 11,124 kW-months/year |
$(-29,590) (-6,138) MMBtu |
$2,577 - $ |
$58,500 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | LPG | Administrative Changes | Water Consumption |