IAC logo
IAC Assessment: MA0402
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0402
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1997
Principal Product Printed Circuit Boards an Insulated Fiberglass Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 100,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 7,140
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $392,282 5,848,769 kWh $0.07
Electricity Demand $162,387 13,111 kW-months/year $12.39
LPG $325,892 60,456 MMBtu $5.39
TOTAL ENERGY COSTS $880,561
RECOMMENDED SAVINGS* $294,724 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Administrative Changes Water Consumption Electricity Usage Electricity Demand LPG Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$217,449
Cost:
$140,000
$109,213 1,655,041 $137,826 11,124 $(-29,590) (-6,138) - - - - $109,213
1,655,041
kWh
$137,826
11,124
kW-months/year
$(-29,590)
(-6,138)
MMBtu
-
-
$
-
-
Tgal
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$61,092
Cost:
$16,597
$2,592 39,273 - - - - - - $58,500 - $2,592
39,273
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$58,500
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,628
Cost:
$6,075
$7,628 115,475 - - - - - - - - $7,628
115,475
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,721
Cost:
$4,925
$4,721 71,219 - - - - - - - - $4,721
71,219
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,577
Cost:
$4,275
- - - - - - $2,577 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,577
-
$
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,257
Cost:
$200
$1,257 19,050 - - - - - - - - $1,257
19,050
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$294,724
Cost:
$172,072
$125,411 1,900,058 $137,826 11,124 $(-29,590) (-6,138) $2,577 - $58,500 - $125,411
1,900,058
kWh
$137,826
11,124
kW-months/year
$(-29,590)
(-6,138)
MMBtu
$2,577
-
$
$58,500
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand LPG Administrative Changes Water Consumption Electricity Usage Electricity Demand LPG Administrative Changes Water Consumption