Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1997 |
Principal Product | Malleable Iron Castings |
NAICS | n/a |
SIC | 3322 - Malleable Iron Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 148 |
Plant Area (Sq.Ft.) | 77,000 |
Annual Production | 4,800 Tons |
Production Hrs. Annual | 6,120 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $770,485 | 12,133,939 | kWh | $0.06 |
Electricity Demand | $98,782 | 11,428 | kW-months/year | $8.64 |
Natural Gas | $129,923 | 27,830 | MMBtu | $4.67 |
TOTAL ENERGY COSTS | $999,190 | |||
RECOMMENDED SAVINGS* | $472,664 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $425,048 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $412,115 Cost: $1,000,000 |
$551,345 | 8,420,575 | $(-139,230) | (-30,600) | - | - | - | - |
$551,345 8,420,575 kWh |
$(-139,230) (-30,600) MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,416 Cost: $16,505 |
$13,378 | 198,124 | - | - | - | - | $38 | - |
$13,378 198,124 kWh |
- - MMBtu |
- - lb |
$38 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $12,933 Cost: $71,400 |
- | - | $12,933 | 2,973 | - | - | - | - |
- - kWh |
$12,933 2,973 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION |
Savings: $34,200 Cost: - |
- | - | - | - | $34,200 | 3,600,000 | - | - |
- - kWh |
- - MMBtu |
$34,200 3,600,000 lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: - Cost: - |
- | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $472,664 Cost: $1,087,905 |
$564,723 | 8,618,699 | $(-126,297) | (-27,627) | $34,200 | 3,600,000 | $38 | - | $564,723 8,618,699 kWh |
$(-126,297) (-27,627) MMBtu |
$34,200 3,600,000 lb |
$38 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $425,048 Cost: $1,071,400 |
$551,345 | 8,420,575 | $(-126,297) | (-27,627) | - | - | - | - | $551,345 8,420,575 kWh |
$(-126,297) (-27,627) MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Water Consumption |