IAC logo
IAC Assessment: MA0409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1998
Principal Product Remanufactrued Electric Motors
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 49,000
Annual Production 6,010 Pieces
Production Hrs. Annual 6,656
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,132 741,794 kWh $0.09
Electricity Demand $9,672 2,244 kW-months/year $4.31
Natural Gas $58,520 7,591 MMBtu $7.71
Fuel Oil #2 $700 129 MMBtu $5.43
TOTAL ENERGY COSTS $133,024
RECOMMENDED SAVINGS* $4,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,956
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$5,000
Cost:
$650
- - - - - - $5,000 - -
-
kWh
-
-
MMBtu
-
-
$
$5,000
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$351
Cost:
$215
$351 4,103 - - - - - - $351
4,103
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$157
Cost:
$181
$157 1,758 - - - - - - $157
1,758
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$392
Cost:
-
- - - - $392 - - - -
-
kWh
-
-
MMBtu
$392
-
$
-
-
$
05: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$(-1,436)
Cost:
$815
$392 4,689 $(-1,828) (-256) - - - - $392
4,689
kWh
$(-1,828)
(-256)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$4,464
Cost:
$1,861
$900 10,550 $(-1,828) (-256) $392 - $5,000 - $900
10,550
kWh
$(-1,828)
(-256)
MMBtu
$392
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$3,956
Cost:
$1,465
$392 4,689 $(-1,828) (-256) $392 - $5,000 - $392
4,689
kWh
$(-1,828)
(-256)
MMBtu
$392
-
$
$5,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost