Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1998 |
Principal Product | metal and wood chairs |
NAICS | n/a |
SIC | 2599 - Furniture And Fixtures, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 252 |
Plant Area (Sq.Ft.) | 303,600 |
Annual Production | 306,800 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $133,917 | 2,052,462 | kWh | $0.07 |
Electricity Demand | $119,007 | 8,214 | kW-months/year | $14.49 |
Natural Gas | $97,294 | 19,341 | MMBtu | $5.03 |
TOTAL ENERGY COSTS | $350,218 | |||
RECOMMENDED SAVINGS* | $187,372 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,473 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $171,700 Cost: $200,000 |
- | - | - | - | - | - | $171,700 | - |
- - kWh |
- - kW-months/year |
- - $ |
$171,700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $7,333 Cost: $225 |
$3,595 | 55,100 | $3,477 | 221 | $261 | - | - | - |
$3,595 55,100 kWh |
$3,477 221 kW-months/year |
$261 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $7,128 Cost: $9,975 |
- | - | - | - | $7,128 | - | - | - |
- - kWh |
- - kW-months/year |
$7,128 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $631 Cost: $517 |
$631 | 9,086 | - | - | - | - | - | - |
$631 9,086 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $440 Cost: $255 |
$440 | 6,741 | - | - | - | - | - | - |
$440 6,741 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $140 Cost: $140 |
$140 | 2,052 | - | - | - | - | - | - |
$140 2,052 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $187,372 Cost: $211,112 |
$4,806 | 72,979 | $3,477 | 221 | $7,389 | - | $171,700 | - | $4,806 72,979 kWh |
$3,477 221 kW-months/year |
$7,389 - $ |
$171,700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,473 Cost: $365 |
$3,735 | 57,152 | $3,477 | 221 | $261 | - | - | - | $3,735 57,152 kWh |
$3,477 221 kW-months/year |
$261 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Administrative Changes | Primary Raw Material |