IAC logo
IAC Assessment: MA0412
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0412
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1998
Principal Product Press fabrics
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales n/a
# of Employees 200
Plant Area (Sq.Ft.) 208,000
Annual Production 1,820 Pieces
Production Hrs. Annual 8,664
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $555,409 8,739,742 kWh $0.06
Electricity Demand $187,647 21,644 kW-months/year $8.67
Natural Gas $126,108 31,027 MMBtu $4.06
TOTAL ENERGY COSTS $869,164
RECOMMENDED SAVINGS* $103,539 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,681
Cost:
$7,454
- - - - - - - - $25,681 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$25,681
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,189
Cost:
$9,625
$6,189 94,666 - - - - - - - - $6,189
94,666
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,088
Cost:
$323
$2,088 31,946 - - - - - - - - $2,088
31,946
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,686
Cost:
$3,400
$1,686 25,791 - - - - - - - - $1,686
25,791
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$925
Cost:
$403
- - - - - - - - $925 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$925
-
Tgal
06: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$65,920
Cost:
$385,000
$20,099 307,444 $41,333 4,956 $(-2,337) (-615) $6,825 - - - $20,099
307,444
kWh
$41,333
4,956
kW-months/year
$(-2,337)
(-615)
MMBtu
$6,825
-
$
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,050
Cost:
$7,800
$1,050 16,120 - - - - - - - - $1,050
16,120
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$103,539
Cost:
$414,005
$31,112 475,967 $41,333 4,956 $(-2,337) (-615) $6,825 - $26,606 - $31,112
475,967
kWh
$41,333
4,956
kW-months/year
$(-2,337)
(-615)
MMBtu
$6,825
-
$
$26,606
-
Tgal
TOTAL IMPLEMENTED Savings:
$30,380
Cost:
$11,580
$3,774 57,737 - - - - - - $26,606 - $3,774
57,737
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$26,606
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption