Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1998
Principal Product Finished Broadwoven Cotton Fabric
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 180,000
Annual Production 3,750 Thousand Feet
Production Hrs. Annual 2,860
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,403 2,203,986 kWh $0.05
Electricity Demand $88,948 11,331 kW-months/year $7.85
Natural Gas $199,780 59,758 MMBtu $3.34
Fuel Oil #6 $57,406 22,946 MMBtu $2.50
TOTAL ENERGY COSTS $453,537
RECOMMENDED SAVINGS* $56,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $246
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6
$ kWh $ kW-months/year $ MMBtu
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$16,605
Cost:
$14,585
$(-107) (-2,052) $(-71) (-9) $16,783 6,713 $(-107)
(-2,052)
kWh
$(-71)
(-9)
kW-months/year
$16,783
6,713
MMBtu
02: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$37,587
Cost:
$40,000
$23,080 440,504 $14,507 1,836 - - $23,080
440,504
kWh
$14,507
1,836
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,062
Cost:
$6,430
$2,062 38,687 - - - - $2,062
38,687
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$246
Cost:
$195
$246 4,689 - - - - $246
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$56,500
Cost:
$61,210
$25,281 481,828 $14,436 1,827 $16,783 6,713 $25,281
481,828
kWh
$14,436
1,827
kW-months/year
$16,783
6,713
MMBtu
TOTAL IMPLEMENTED Savings:
$246
Cost:
$195
$246 4,689 - - - - $246
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6