Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1998 |
Principal Product | Door and 4WD actuators |
NAICS | n/a |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $5,000,000-$10,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 7,200,000 Pieces |
Production Hrs. Annual | 6,425 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $267,479 | 4,133,939 | kWh | $0.06 |
Electricity Demand | $155,989 | 11,486 | kW-months/year | $13.58 |
Natural Gas | $26,081 | 3,457 | MMBtu | $7.54 |
TOTAL ENERGY COSTS | $464,675 | |||
RECOMMENDED SAVINGS* | $31,235 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,565 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $9,186 Cost: $19,050 |
$1,730 | 22,567 | $8,040 | 432 | $(-584) | (-99) | - | - |
$1,730 22,567 kWh |
$8,040 432 kW-months/year |
$(-584) (-99) MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,715 Cost: $7,055 |
- | - | $5,715 | - | - | - | - | - |
- - kWh |
$5,715 - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,885 Cost: $242 |
- | - | - | - | $2,885 | 489 | - | - |
- - kWh |
- - kW-months/year |
$2,885 489 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $4,093 Cost: $4,800 |
- | - | - | - | - | - | $4,093 | 99,900 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,093 99,900 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $3,533 Cost: $2,700 |
- | - | - | - | - | - | $3,533 | 109,350 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,533 109,350 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,828 Cost: $426 |
$2,065 | 21,981 | $763 | 41 | - | - | - | - |
$2,065 21,981 kWh |
$763 41 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,159 Cost: $1,840 |
$2,159 | 31,653 | - | - | - | - | - | - |
$2,159 31,653 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $836 Cost: $200 |
$836 | 13,189 | - | - | - | - | - | - |
$836 13,189 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,235 Cost: $36,313 |
$6,790 | 89,390 | $14,518 | 473 | $2,301 | 390 | $7,626 | 209,250 | $6,790 89,390 kWh |
$14,518 473 kW-months/year |
$2,301 390 MMBtu |
$7,626 209,250 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,565 Cost: $26,731 |
$4,631 | 57,737 | $14,518 | 473 | $(-584) | (-99) | - | - | $4,631 57,737 kWh |
$14,518 473 kW-months/year |
$(-584) (-99) MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |