IAC logo
IAC Assessment: MA0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Rubber Seals
NAICS n/a
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 55,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $544,309 8,647,128 kWh $0.06
Electricity Demand $143,203 23,361 kW-months/year $6.13
Natural Gas $25,897 5,977 MMBtu $4.33
Fuel Oil #2 $1,170 268 MMBtu $4.37
TOTAL ENERGY COSTS $714,579
RECOMMENDED SAVINGS* $100,547 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,123
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$35,895
Cost:
$41,600
$40,390 641,266 $10,074 1,644 $(-14,569) (-2,574) $40,390
641,266
kWh
$10,074
1,644
kW-months/year
$(-14,569)
(-2,574)
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,170
Cost:
$27,774
$22,577 361,372 $1,593 260 - - $22,577
361,372
kWh
$1,593
260
kW-months/year
-
-
MMBtu
03: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$7,745
Cost:
$12,435
$7,745 122,802 - - - - $7,745
122,802
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,831
Cost:
$44,552
$14,942 237,104 $5,592 912 $(-4,703) (-1,091) $14,942
237,104
kWh
$5,592
912
kW-months/year
$(-4,703)
(-1,091)
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,698
Cost:
$75,790
$13,217 209,848 $7,356 1,200 $(-3,875) (-895) $13,217
209,848
kWh
$7,356
1,200
kW-months/year
$(-3,875)
(-895)
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$148
Cost:
$77
$148 2,345 - - - - $148
2,345
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7122 DISCONNECT BALLASTS Savings:
$60
Cost:
$100
$60 879 - - - - $60
879
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$100,547
Cost:
$202,328
$99,079 1,575,616 $24,615 4,016 $(-23,147) (-4,560) $99,079
1,575,616
kWh
$24,615
4,016
kW-months/year
$(-23,147)
(-4,560)
MMBtu
TOTAL IMPLEMENTED Savings:
$32,123
Cost:
$40,386
$30,530 487,398 $1,593 260 - - $30,530
487,398
kWh
$1,593
260
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas