IAC logo
IAC Assessment: MA0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Metal Fabric and Hex Netting
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 58
Plant Area (Sq.Ft.) 250,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,706 2,226,260 kWh $0.07
Electricity Demand $68,684 9,645 kW-months/year $7.12
Natural Gas $151,863 30,834 MMBtu $4.93
TOTAL ENERGY COSTS $391,797
RECOMMENDED SAVINGS* $60,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,327
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product By-product Production Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ %
01: 4.632 CHANGE OPERATING CONDITIONS Savings:
$29,415
Cost:
$130,900
$729 10,258 - - - - - - - - $11,440 - $17,246 - $729
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$11,440
-
$
$17,246
-
%
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,896
Cost:
$15,790
$4,460 62,720 $436 120 - - - - - - - - - - $4,460
62,720
kWh
$436
120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
%
03: 4.632 CHANGE OPERATING CONDITIONS Savings:
$2,562
Cost:
$27,140
- - - - - - - - $2,562 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,562
-
$
-
-
$
-
-
%
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,444
Cost:
$3,400
$1,444 20,223 - - - - - - - - - - - - $1,444
20,223
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
%
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,278
Cost:
$5,204
- - - - $3,278 918 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,278
918
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
%
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,349
Cost:
$70,000
- - - - $12,349 3,459 - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,349
3,459
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
%
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$709
Cost:
$1,245
$709 9,965 - - - - - - - - - - - - $709
9,965
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
%
08: 3.4151 MINIMIZE WATER USAGE Savings:
$6,136
Cost:
$10,000
- - - - - - $6,136 1,300,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,136
1,300,000
Tgal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$60,789
Cost:
$263,679
$7,342 103,166 $436 120 $15,627 4,377 $6,136 1,300,000 $2,562 - $11,440 - $17,246 - $7,342
103,166
kWh
$436
120
kW-months/year
$15,627
4,377
MMBtu
$6,136
1,300,000
Tgal
$2,562
-
$
$11,440
-
$
$17,246
-
%
TOTAL IMPLEMENTED Savings:
$10,327
Cost:
$25,639
$6,613 92,908 $436 120 $3,278 918 - - - - - - - - $6,613
92,908
kWh
$436
120
kW-months/year
$3,278
918
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Primary Product By-product Production Increase in Production