IAC logo
IAC Assessment: MA0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Electrocoating
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 58
Plant Area (Sq.Ft.) 27,000
Annual Production 0 Units
Production Hrs. Annual 3,510
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,831 1,074,736 kWh $0.06
Electricity Demand $16,452 4,354 kW-months/year $3.78
Natural Gas $28,745 5,780 MMBtu $4.97
Fuel Oil #2 $4,124 1,093 MMBtu $3.77
TOTAL ENERGY COSTS $110,152
RECOMMENDED SAVINGS* $88,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,789
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$21,168
Cost:
$5,704
- - - - - - $21,168 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,168
-
$
02: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$43,200
Cost:
$3,000
- - - - - - $43,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$43,200
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,964
Cost:
$40,000
$15,569 203,986 $5,067 1,396 $(-4,672) (-870) - - $15,569
203,986
kWh
$5,067
1,396
kW-months/year
$(-4,672)
(-870)
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,069
Cost:
$26,625
$7,069 92,614 - - - - - - $7,069
92,614
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$789
Cost:
-
$789 10,258 - - - - - - $789
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$632
Cost:
$2,250
- - - - $632 118 - - -
-
kWh
-
-
kW-months/year
$632
118
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$88,822
Cost:
$77,579
$23,427 306,858 $5,067 1,396 $(-4,040) (-752) $64,368 - $23,427
306,858
kWh
$5,067
1,396
kW-months/year
$(-4,040)
(-752)
MMBtu
$64,368
-
$
TOTAL IMPLEMENTED Savings:
$65,789
Cost:
$10,954
$789 10,258 - - $632 118 $64,368 - $789
10,258
kWh
-
-
kW-months/year
$632
118
MMBtu
$64,368
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production