IAC logo
IAC Assessment: MA0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Tofu and Soy milk
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 125,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,072 5,166,471 kWh $0.06
Electricity Demand $61,976 12,100 kW-months/year $5.12
Electricity Fees $32,193 - $ -
Natural Gas $153,558 36,109 MMBtu $4.25
TOTAL ENERGY COSTS $536,799
RECOMMENDED SAVINGS* $165,563 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,899
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$160,542
Cost:
$811,250
$277,864 4,614,009 $26,833 7,392 $(-104,155) (-31,658) $(-40,000) - $277,864
4,614,009
kWh
$26,833
7,392
kW-months/year
$(-104,155)
(-31,658)
MMBtu
$(-40,000)
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,122
Cost:
$7,125
- - $3,122 860 - - - - -
-
kWh
$3,122
860
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,546
Cost:
$472
- - - - $1,546 470 - - -
-
kWh
-
-
kW-months/year
$1,546
470
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$353
Cost:
$1,090
$353 5,862 - - - - - - $353
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$165,563
Cost:
$819,937
$278,217 4,619,871 $29,955 8,252 $(-102,609) (-31,188) $(-40,000) - $278,217
4,619,871
kWh
$29,955
8,252
kW-months/year
$(-102,609)
(-31,188)
MMBtu
$(-40,000)
-
$
TOTAL IMPLEMENTED Savings:
$1,899
Cost:
$1,562
$353 5,862 - - $1,546 470 - - $353
5,862
kWh
-
-
kW-months/year
$1,546
470
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production