IAC Assessment: MA0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product Cargo Containers, Kayaks
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 202,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 5,616
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,557 3,845,838 kWh $0.04
Electricity Demand $152,801 11,913 kW-months/year $12.83
Electricity Fees $63,756 - $ -
Natural Gas $213,160 34,608 MMBtu $6.16
TOTAL ENERGY COSTS $574,274
RECOMMENDED SAVINGS* $27,878 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,195
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,407
Cost:
$19,500
$6,921 173,212 $2,486 179 - - $6,921
173,212
kWh
$2,486
179
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,131
Cost:
$4,925
- - $2,131 182 - - -
-
kWh
$2,131
182
kW-months/year
-
-
MMBtu
03: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$1,511
Cost:
$2,500
$1,511 34,291 - - - - $1,511
34,291
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,321
Cost:
$45,420
$7,849 181,125 $4,472 322 - - $7,849
181,125
kWh
$4,472
322
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$591
Cost:
$120
$591 13,482 - - - - $591
13,482
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$504
Cost:
$455
$504 12,603 - - - - $504
12,603
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$473
Cost:
$748
- - - - $473 180 -
-
kWh
-
-
kW-months/year
$473
180
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$940
Cost:
$5,925
$940 23,447 - - - - $940
23,447
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,878
Cost:
$79,593
$18,316 438,160 $9,089 683 $473 180 $18,316
438,160
kWh
$9,089
683
kW-months/year
$473
180
MMBtu
TOTAL IMPLEMENTED Savings:
$3,195
Cost:
$5,793
$591 13,482 $2,131 182 $473 180 $591
13,482
kWh
$2,131
182
kW-months/year
$473
180
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas