Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1999 |
Principal Product | foam tape, decorative metal laminates, drawer inserts |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 5,812 Thousand Feet |
Production Hrs. Annual | 4,160 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,482 | 1,599,062 | kWh | $0.06 |
Electricity Demand | $33,850 | 6,642 | kW-months/year | $5.10 |
Electricity Fees | $13,278 | - | $ | - |
Natural Gas | $108,845 | 17,337 | MMBtu | $6.28 |
TOTAL ENERGY COSTS | $257,455 | |||
RECOMMENDED SAVINGS* | $74,161 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,887 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $65,104 Cost: $361,250 |
$31,564 | 497,362 | $14,680 | 1,800 | $38,860 | 7,346 | $(-20,000) | - |
$31,564 497,362 kWh |
$14,680 1,800 kW-months/year |
$38,860 7,346 MMBtu |
$(-20,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,147 Cost: $6,075 |
$2,288 | 36,049 | $859 | 104 | - | - | - | - |
$2,288 36,049 kWh |
$859 104 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,455 Cost: $80 |
$1,786 | 28,136 | $669 | 81 | - | - | - | - |
$1,786 28,136 kWh |
$669 81 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL |
Savings: $1,558 Cost: $5,000 |
$(-112) | (-1,758) | - | - | $2,405 | 306 | $(-735) | - |
$(-112) (-1,758) kWh |
- - kW-months/year |
$2,405 306 MMBtu |
$(-735) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $837 Cost: $1,976 |
$837 | 13,189 | - | - | - | - | - | - |
$837 13,189 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $558 Cost: - |
$558 | 8,792 | - | - | - | - | - | - |
$558 8,792 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $316 Cost: $1,425 |
$316 | 4,982 | - | - | - | - | - | - |
$316 4,982 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $186 Cost: $880 |
$186 | 2,931 | - | - | - | - | - | - |
$186 2,931 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,161 Cost: $376,686 |
$37,423 | 589,683 | $16,208 | 1,985 | $41,265 | 7,652 | $(-20,735) | - | $37,423 589,683 kWh |
$16,208 1,985 kW-months/year |
$41,265 7,652 MMBtu |
$(-20,735) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,887 Cost: $6,505 |
$2,548 | 40,152 | $669 | 81 | $2,405 | 306 | $(-735) | - | $2,548 40,152 kWh |
$669 81 kW-months/year |
$2,405 306 MMBtu |
$(-735) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |