IAC Assessment: MA0448
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0448
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1999
Principal Product foam tape, decorative metal laminates, drawer inserts
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 110,000
Annual Production 5,812 Thousand Feet
Production Hrs. Annual 4,160
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,482 1,599,062 kWh $0.06
Electricity Demand $33,850 6,642 kW-months/year $5.10
Electricity Fees $13,278 - $ -
Natural Gas $108,845 17,337 MMBtu $6.28
TOTAL ENERGY COSTS $257,455
RECOMMENDED SAVINGS* $74,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,887
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$65,104
Cost:
$361,250
$31,564 497,362 $14,680 1,800 $38,860 7,346 $(-20,000) - $31,564
497,362
kWh
$14,680
1,800
kW-months/year
$38,860
7,346
MMBtu
$(-20,000)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,147
Cost:
$6,075
$2,288 36,049 $859 104 - - - - $2,288
36,049
kWh
$859
104
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,455
Cost:
$80
$1,786 28,136 $669 81 - - - - $1,786
28,136
kWh
$669
81
kW-months/year
-
-
MMBtu
-
-
$
04: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL Savings:
$1,558
Cost:
$5,000
$(-112) (-1,758) - - $2,405 306 $(-735) - $(-112)
(-1,758)
kWh
-
-
kW-months/year
$2,405
306
MMBtu
$(-735)
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$837
Cost:
$1,976
$837 13,189 - - - - - - $837
13,189
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$558
Cost:
-
$558 8,792 - - - - - - $558
8,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$316
Cost:
$1,425
$316 4,982 - - - - - - $316
4,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$186
Cost:
$880
$186 2,931 - - - - - - $186
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$74,161
Cost:
$376,686
$37,423 589,683 $16,208 1,985 $41,265 7,652 $(-20,735) - $37,423
589,683
kWh
$16,208
1,985
kW-months/year
$41,265
7,652
MMBtu
$(-20,735)
-
$
TOTAL IMPLEMENTED Savings:
$4,887
Cost:
$6,505
$2,548 40,152 $669 81 $2,405 306 $(-735) - $2,548
40,152
kWh
$669
81
kW-months/year
$2,405
306
MMBtu
$(-735)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes